Affiner la recherche

Tags et Filtres

    Résultats de la recherche

    333 résultat(s) trouvé(s) Trier par
    1. Tags associés:

    2. Pléiades and ELISA satellites successfully launched

      Date de publication:

      14 Août 2011

      The Russian Soyuz launcher successfully completed its second flight from French Guiana, orbiting the Pléiades, ELISA and SSOT satellites today.

      Tags associés:

    3. COROT enters home straight

      Date de publication:

      30 Novembre 2006

      CNES’s trailblazing COROT satellite is all set to embark on its quest for new worlds, with launch scheduled 27 December, 15:23 Paris time.

      Tags associés:

    4. ExoMars: Schiaparelli spotted by MRO

      Date de publication:

      25 Octobre 2016

      NASA’s Mars Reconnaissance Orbiter (MRO) has identified markings probably left by the impact of the Schiaparelli entry, descent and landing technology demonstrator module on the planet’s surface.

      Tags associés:

    5. Flight and ground operating manual and constraints- E-15

      Date de publication:

      16 Janvier 2012

      Describe the product features and operating recommendations towards the final users

    6. Le CNES a renouvelé avec l’Ecole de l’air le protocole relatif à la formation à l’espace

      Date de publication:

      11 Avril 2016

      Le CNES consacre une part conséquente de son activité aux programmes du Ministère de la Défense. Pour optimiser son action, il soutient la formation de ses officiers dans le domaine spatial. Dans ce cadre, le CNES a signé avec l’Ecole de l’air, le vendredi 8 avril, un protocole formalisant les actions visant à aider le commandement de l’Ecole à apporter aux élèves les connaissances indispensables à l’exercice de leurs futures responsabilités dans le domaine de l’espace.

      Tags associés:

    7. Jean-Marc Astorg

      Date de publication:

      5 Juillet 2012

      Jean-Marc Astorg - Launch Vehicles Directorate

      Tags associés:

    8. Satellite

      Date de publication:

      9 Octobre 2014

      Tags associés:

    9. Tags associés:

    10. ExoMars 2016: Perfecting the Trajectory!

      Date de publication:

      2 Septembre 2016

      On 19 October, the landing demonstrator known as ExoMars Schiaparelli will touch down on Mars after detaching itself from the Trace Gas Orbiter (TGO). Its job is to validate new technologies and to demonstrate Europe’s ability to land on Mars, as well as to take scientific measurements. The orbiter’s trajectory has just been adjusted to ensure the success of the two events scheduled for 19 October—the landing of Schiaparelli in the Meridiani Planum region, and TGO’s insertion into orbit.

      Tags associés:

    11. EGNOS control centre opens in Toulouse

      Date de publication:

      4 Avril 2005

      The EGNOS* PACF**, an important milestone in the development of Europe’s satellite navigation system, was opened at the Toulouse Space Centre on 24 March. This control centre, operated jointly by the French civil aviation authority DGAC and CNES, is a key component of EGNOS. The official opening ceremony was attended by Gilles de Robien, France’s Minister for Infrastructure, Transport, Land Planning, Tourism and Maritime Affairs, accompanied by François d'Aubert, Minister for Research.

      Tags associés:

    12. Thomas Pesquet, 10e astronaute français

      Date de publication:

      11 Mars 2020

      Thomas Pesquet est le 10e astronaute français à être allé dans l’espace. Entre novembre 2016 et juin 2017, il a séjourné 196 jours dans la Station spatiale internationale dans le cadre de la mission Proxima. Pour sa seconde mission, Alpha, il a décollé à destination de l'ISS le 23 avril 2021 depuis Cap Canaveral, en Floride.

      Tags associés:

    13. Documentation and configuration management plan- M-9

      Date de publication:

      16 Janvier 2012

      Identify and manage the documents that are useful and necessary to the project, define the configuration of the product and how it changes

    14. Integration procedure- E-11

      Date de publication:

      15 Juin 2016

      Set up and implement an integration activity

    15. Tags associés:

    16. AIT Deliverables- E-14

      Date de publication:

      16 Janvier 2012

      Describe all the deliverables associated with the product to be integrated by the customer

    17. How launchers work

      Date de publication:

      30 Avril 2015

      How launchers work

      Tags associés:

    18. Design justification file- E-7

      Date de publication:

      16 Janvier 2012

      Justify the technical solution selected and comply with the Technical Specification

    Pages